2D DWG (AUTOCAD) FILES

ArtikelPost Datum / Autor
WEB-223

WEB-223.dwg Schedule drawing for DN15 (½") T bodies with DN8 (¼") Sample with mainline butt weld ISO 1127 S1 and branches hygienic clamp ends with IS0 1127 S1 bore complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details).

10/27/2020
by CraneCPE

WEB-224

WEB-224.dwg Schedule drawing for DN20 (¾") T bodies with DN8 (¼") Sample with mainline butt weld ISO 1127 S1 and branches hygienic clamp ends with IS0 1127 S1 bore complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details).

10/27/2020
by CraneCPE

WEB-225

WEB-225.dwg Schedule drawing for DN25 (1") T bodies with DN8 (¼") Sample with mainline butt weld ISO 1127 S1 and branches hygienic clamp ends with IS0 1127 S1 bore complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details).

10/27/2020
by CraneCPE

WEB-226

WEB-226.dwg Schedule drawing for DN40 (1½") T bodies with DN8 (¼") Sample with mainline butt weld ISO 1127 S1 and branches hygienic clamp ends with IS0 1127 S1 bore complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details).

10/27/2020
by CraneCPE

WEB-227

WEB-227.dwg Schedule drawing for DN50 (2") T bodies with DN8 (¼") Sample with mainline butt weld ISO 1127 S1 and branches hygienic clamp ends with IS0 1127 S1 bore complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details).

10/27/2020
by CraneCPE

WEB-228

WEB-228.dwg Schedule drawing for DN65 (2½") T bodies with DN8 (¼") Sample with mainline butt weld ISO 1127 S1 and branches hygienic clamp ends with IS0 1127 S1 bore complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details).

10/27/2020
by CraneCPE

WEB-229

WEB-229.dwg Schedule drawing for DN80 (3") T bodies with DN8 (¼") Sample with mainline butt weld ISO 1127 S1 and branches hygienic clamp ends with IS0 1127 S1 bore complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details).

10/27/2020
by CraneCPE