
WEB-184.dwg
Schedule drawing for DN8 (¼") point of use T bodies with branch hygienic clamp with ISO 1127 S1 bore and mainline butt weld ISO 1127 S1 complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 by
CraneCPE |

WEB-185.dwg
Schedule drawing for DN15 (½") point of use T bodies with branch hygienic clamp with ISO 1127 S1 bore and mainline butt weld ISO 1127 S1 complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 by
CraneCPE |

WEB-186.dwg
Schedule drawing for DN20 (¾") point of use T bodies with branch hygienic clamp with ISO 1127 S1 bore and mainline butt weld ISO 1127 S1 complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 by
CraneCPE |

WEB-187.dwg
Schedule drawing for DN25 (1") point of use T bodies with branch hygienic clamp with ISO 1127 S1 bore and mainline butt weld ISO 1127 S1 complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 by
CraneCPE |

WEB-188.dwg
Schedule drawing for DN40 (1½") point of use T bodies with branch hygienic clamp with ISO 1127 S1 bore and mainline butt weld ISO 1127 S1 complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 by
CraneCPE |

WEB-189.dwg
Schedule drawing for DN50 (2") point of use T bodies with branch hygienic clamp with ISO 1127 S1 bore and mainline butt weld ISO 1127 S1 complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 by
CraneCPE |

WEB-190.dwg
Schedule drawing for DN65 (2½") point of use T bodies with branch hygienic clamp with ISO 1127 S1 bore and mainline butt weld ISO 1127 S1 complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 by
CraneCPE |

WEB-191.dwg
Schedule drawing for DN80 (3") point of use T bodies with branch hygienic clamp with ISO 1127 S1 bore and mainline butt weld ISO 1127 S1 complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 by
CraneCPE |