项目 | 发表日期/作者 |
---|---|
WEB-176.dwg Schedule drawing for DN8 (¼”) point of use T bodies with all ends butt weld IS0 1127 S1 complete with top works options (Page 1 - Body Only Details | 10/27/2020 |
WEB-177.dwg Schedule drawing for DN15 (½") point of use T bodies with all ends butt weld IS0 1127 S1 complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 |
WEB-178.dwg Schedule drawing for DN20 (¾") point of use T bodies with all ends butt weld IS0 1127 S1 complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 |
WEB-179.dwg Schedule drawing for DN25 (1") point of use T bodies with all ends butt weld IS0 1127 S1 complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 |
WEB-180.dwg Schedule drawing for DN40 (1½") point of use T bodies with all ends butt weld IS0 1127 S1 complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 |
WEB-181.dwg Schedule drawing for DN50 (2") point of use T bodies with all ends butt weld IS0 1127 S1 complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 |
WEB-182.dwg Schedule drawing for DN65 (2½") point of use T bodies with all ends butt weld IS0 1127 S1 complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 |
WEB-183.dwg Schedule drawing for DN80 (3") point of use T bodies with all ends butt weld IS0 1127 S1 complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 |