项目 | 发表日期/作者 |
---|---|
WEB-091.dwg Schedule drawing for DN8 (¼") to DN80 (3") 2-Way MKIV Forged bodies with butt weld ISO 1127 S1 ends complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 |
项目 | 发表日期/作者 |
---|---|
WEB-091.dwg Schedule drawing for DN8 (¼") to DN80 (3") 2-Way MKIV Forged bodies with butt weld ISO 1127 S1 ends complete with top works options (Page 1 - Body Only Details, Page 2 – Valve Assembly Details). | 10/27/2020 |